FREE SPACE PLANNING

Our Projects

Office Fit Out/Communal Parts Refurbishment

Flitcroft House

Location: Mayfair, London
Size: 6,000 sq ft
Category: Cat A+
Duration: 20 weeks

Cat A fit out on behalf of one of our landlord clients, the spec was to refurbish 3 floors of office space with an overall area of circa 6,000sqft as well as the communal areas from Entrance Hallway to 4th floor. The work involved new lighting, small power and optical data throughout, new carpet/vinyl flooring laid to offices and communal areas, full decoration, installation of new modern entrance door and signage, bespoke cabinetry, new kitchens to each floor which involved creating a new floor to 3rd-floor level by constructing an infill to a lightwell area. The project was a Design & Build with full management plan and was brought in a week ahead of schedule.

“We have been working with Imperial Building Solutions for 2 years now, most notably on the fit out of three floors of a central London office building. The Imperial team have been a pleasure to work with from start to finish. We have been delighted with the quality of their work, their communication, their attitude towards solving unforeseen problems and, last but not least, their costs. All projects have been delivered both on time and to the high standards of finish required. We would have absolutely no hesitation in recommending them.”
Simon Long
The E&A Group
last Project
Next Project